Float Painting 2007 #6
Caboose is getting closer to being completed.
06/30/07 - Chuck is adding the finishing touches to the caboose
before our 4th of July parades.
06/30/07 - All of the trim needed an extra coat. The steps received
an extra heavy coat of paint.
06/30/07 - For years we operated the steam engine without
having a drain on the air tank. The drain had been on the work
list for a long time, today it was corrected.
06/30/07 - New tires on the front of the engine was another item
on the long list of things I wanted to get done. Finally I was able to
get them changed out too.
06/30/07 - The board that holds the chains was broken so
it was just cut shorter.
**********************************Doing anything to push GSRM towards its goal of opening is rewarding!
Email GSRM for Information info@gsrm.org